The state-of-the-art has been advanced by CBI Na-Con Inc. (CBI) in the completion of a turnkey contract, providing a computer controlled high vacuum thermal facility at Rockwell International. The chamber is the first designed and constructed for production-line-type testing of satellites. Four computers networked together provide complete control of the vacuum process, data acquisition, and history logging. A truncated side hinged door provides easy access into the chamber without bridges or lifts and a structural, LN2 cooled flat floor provides a 25 ft W*30 ft L work space. The aluminum shrouds inside provide temperatures of less than 90K with a 40 kW concentrated heat load. The chamber is also designed so that it can be expanded to twice its present volume to accommodate a solar simulator. The unique features of this facility, including the computer integration of vacuum process equipment, specialized instrumentation and data acquisition equipment is discussed in this paper.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Advanced turnkey computer controlled thermal vacuum facility


    Weitere Titelangaben:

    Fortschrittliche Moeglichkeiten mit schluesselfertigem, rechnergeregeltem thermischem Vakuumsystem


    Beteiligte:
    Cary, R.W. (Autor:in)


    Erscheinungsdatum :

    1986


    Format / Umfang :

    4 Seiten



    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Implementing turnkey contracts

    East, R. / Institution of Mechanical Engineers / Institution of Civil Engineers | British Library Conference Proceedings | 2001


    Turnkey takes off

    Abbott, Jame | IuD Bahn | 2008


    Signature - Turnkey signing

    Clinquart, R. | Online Contents | 1998


    TEG advocates turnkey approach

    Online Contents | 1995


    Turnkey Power For The Oilfield

    Online Contents | 2010