As the Class Rc thyristor locomotive has evolved through five versions over 13 years, the feedback from Swedish State Railways' engineers to ASEA's designers has confirmed the value of easy component and subassembly replacement, but cast some doubt on the economics of doing this purely on the basis of distance run. SJ is seeking new methods of in-situ component testing so that replacement can be deferred until it is really necessary. The next step is computer-based maintenance records that will automatically generate failure and reliability statistics for use by the designer as well as the maintenance engineer. Ultimately, it should be possible for the designer to predict long-term maintenance needs, and thus optimise whole-life cost.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Reliability analysis and in-situ testing augments programmed maintenance (electric locomotives)


    Weitere Titelangaben:

    Zuverlaessigkeitsanalyse und Pruefung an Ort und Stelle vergroessert die programmierte Wartung von Elektrolokomotiven


    Beteiligte:
    Marklund, B. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1980


    Format / Umfang :

    3 Seiten


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    The maintenance of electric locomotives

    Engineering Index Backfile | 1917


    Maintenance of electric locomotives

    Engineering Index Backfile | 1939


    Testing of diesel-electric locomotives

    Swanson, M.C. | Engineering Index Backfile | 1942


    Maintenance and operation of diesel electric locomotives

    Wiles, G.F. | Engineering Index Backfile | 1946


    Maintenance of diesel electric locomotives in service

    Miller, T.C.B. | Engineering Index Backfile | 1963