Overhead electrification involves the designer in a mass of strength and clearance calculations that are repetitive, and therefore well suited to resolution by computer. British Rail has developed and tested programs for overhead equipment design, and their validity is being demonstrated on the London-Bedford electrification due for completion in 1982. With a 20-year programme of main line electrification covering some 500 track-km a year currently under review, the savings in cost and time achieved by computer aided design could be substantial.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Computer aided design of overhead line equipment


    Weitere Titelangaben:

    CAD beim Oberleitungsentwurf


    Beteiligte:
    Scholes, A. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1980


    Format / Umfang :

    2 Seiten


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Computer Vision for overhead-line Equipment Monitoring

    Fararooy, S. / Mair, C. / IEE; Railway Industry Group | British Library Conference Proceedings | 1998


    Monitoring overhead line equipment

    Keen, P.M. | IET Digital Library Archive | 1998


    Overhead Line Supporting Equipment

    KIM SEOK CHAN / SHIN DONG IK | Europäisches Patentamt | 2024

    Freier Zugriff

    Overhead line equipment inspection vehicle

    Engineering Index Backfile | 1950


    Overhead line equipment inspection vehicle

    Engineering Index Backfile | 1951