The development of a sound welding procedure should consider a number of very important aspects. The choice of basic welding variables can provide selective weld characteristics to best fit the design concept and production variables. Further, the development of these aspects into a viable welding procedure may be readily evaluated, in many instances, by performance testing of the weldment under conditions directly associated with the intended service.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Development of Welding Procedures for Operator Protective Structures


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:

    Kongress:

    28th Annual Earthmoving Industry Conference ; 1977



    Erscheinungsdatum :

    01.02.1977




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Protective Structures for Low-Coal Shuttle Car Operator

    J. R. Bartels / A. J. Kwitowski / W. D. Mayercheck | NTIS | 1987





    The development of the welding procedures and fatigue of butt-welded structures of aluminium-AA5383

    Calcraft, R.C. / Wahab, M.A. / Viano, D.M. et al. | Tema Archiv | 1999