Reduction of lead time between design and production is possible through application of modern test techniques. Such techniques involve accurate measurement of customer service load cycle and application of these measured loads to the laboratory and proving ground. Correlation of customer usage with “in house” testing is essential to a realistic projection of test results into anticipated service life.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Perspective - Correlation of Laboratory, Proving Ground, and Customer Testing


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:
    Kuchera, G. J. (Autor:in) / Dixon, W. G. (Autor:in)

    Kongress:

    1967 Automotive Engineering Congress and Exposition ; 1967



    Erscheinungsdatum :

    01.02.1967




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Perspective -- Correlation of laboratory, proving ground, and customer testing

    Dixon, W.G. / Kuchera, G.J. | Engineering Index Backfile | 1967





    Proving Ground Optimization and Damage Correlation with Customer Usage

    Halfpenny, A. / Pompetzki, M. / Society of Automotive Engineers | British Library Conference Proceedings | 2011