Reduction of lead time between design and production is possible through application of modern test techniques; such techniques involve accurate measurement of customer service load cycle and application of these measured loads to laboratory and proving ground; correlation of customer usage with "in house" testing is essential to realistic projection of test results into anticipated service life.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Perspective -- Correlation of laboratory, proving ground, and customer testing


    Weitere Titelangaben:

    SAE -- Paper


    Beteiligte:
    Dixon, W.G. (Autor:in) / Kuchera, G.J. (Autor:in)

    Kongress:

    SAE Meeting ; 1967 Testing



    Erscheinungsdatum :

    1967


    Format / Umfang :

    8 pages


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Perspective - Correlation of Laboratory, Proving Ground, and Customer Testing

    Kuchera, G. J. / Dixon, W. G. | SAE Technical Papers | 1967





    Proving Ground Optimization and Damage Correlation with Customer Usage

    Halfpenny, A. / Pompetzki, M. / Society of Automotive Engineers | British Library Conference Proceedings | 2011