The NASA Instrument Cost Model, NICM, is a suite of tools which allow for probabilistic cost estimation of NASA's space-flight instruments at both the system and subsystem level. NICM also includes the ability to perform cost by analogy as well as joint confidence level (JCL) analysis. The latest version of NICM, Version VI, was released in Spring 2014. This paper will focus on the new features released with NICM VI, which include: 1) The NICM-E cost estimating relationship, which is applicable for instruments flying on Explorer-like class missions; 2) The new cluster analysis ability which, alongside the results of the parametric cost estimation for the user's instrument, also provides a visualization of the user's instrument's similarity to previously flown instruments; and 3) includes new cost estimating relationships for in-situ instruments.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Latest NASA Instrument Cost Model (NICM): Version VI


    Beteiligte:
    Mrozinski, Joe (Autor:in) / Habib-Agahi, Hamid (Autor:in) / Fox, George (Autor:in) / Ball, Gary (Autor:in)

    Kongress:

    AIAA Space 2014 ; 2014 ; San Diego, CA, United States


    Erscheinungsdatum :

    2014-08-05


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Latest NASA Instrument Cost Model (NICM) Version VI

    Mrozinski, Joseph / Habib-Agahi, Hamid / Fox, George et al. | AIAA | 2014


    Latest NASA Instrument Cost Model (NICM) Version VI (AIAA 2014-4205)

    Mrozinski, J. / Habib-Agahi, H. / Fox, G. et al. | British Library Conference Proceedings | 2014


    NASA Instrument Cost Model: NICM 8.5

    Mrozinski, Joseph | NTRS | 2019



    NASA Instrument Cost Model for Explorer-Like Mission Instruments (NICM-E)

    Habib-Agahi, Hamid / Fox, George / Mrozinski, Joe et al. | NTRS | 2013