NICM-E is a cost estimating relationship that supplements the traditional NICM System Level CERs for instruments flown on NASA Explorer-like missions that have the following three characteristics: 1) fly on Class C missions, 2) major development led and performed by universities or research foundations, and 3) have significant level of inheritance.
NASA Instrument Cost Model for Explorer-Like Mission Instruments (NICM-E)
AIAA SPACE 2013 Conference & Exposition ; 2013 ; San Diego, CA, United States
2013-09-10
Aufsatz (Konferenz)
Keine Angabe
Englisch
Latest NASA Instrument Cost Model (NICM): Version VI
NTRS | 2014
|Latest NASA Instrument Cost Model (NICM) Version VI (AIAA 2014-4205)
British Library Conference Proceedings | 2014
|The silent s in NICM: NICM schedule capabilities
NTRS | 2017
|