In March 2007, NASA issued revised rules for space flight project management, NPR 7120.5D, 'NASA Space Flight Program and Project Management Requirements.' Central to the new rules was the construct of Key Decision Points, maturity gates that the project team must pass in order to continue development. In order that the KDP decision be fully informed, the NPR required, as entrance criteria for the gate, the generation and delivery of specified planning, technical, and cost/schedule documents (gate products) and a life-cycle review, the Preliminary Design Review. Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. Key actions were taken to proactively interact with the SRB, produce high-quality gate products with stakeholder review, generate review presentation materials, and handle a myriad of supporting logistical functions. A review preparation team was established, including a Review Captain and leads for documentation, information systems, and logistics, and their roles, responsibilities and task assignments were identified. Aids were produced, including a detailed review preparation schedule and a comprehensive gate products production table. Institutional support was leveraged early and often. Implementation strategy reflected the needs of a nationally-distributed team, as well as applicable export control and IT security requirements. This paper gives a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project PMSR and PDR preparation and execution activities, including positive and negative lessons learned, and identifies recommendations for future NASA (and non-NASA) project teams.
Reducing NPR 7120.5D to Practice: Preparing for a Life-Cycle Review
IEEE Aerospace Conference ; 2008 ; Big Sky, MT, United States
2008-12-16
Aufsatz (Konferenz)
Keine Angabe
Englisch
Reducing military digital testing life cycle costs
Tema Archiv | 1983
|Reducing Life Cycle Costs of main line interlocking
IuD Bahn | 2013
|Reducing life cycle costs of main line interlockings
Tema Archiv | 2013
|