The activities described in this Final Report were authorized and performed under Purchase Order Number H32835D, issued as part of NASA contract number NAS8-00114. The period of performance of this PO was from March 1 to September 30, 2001. The primary work activity was the continued development and updating of the tether dynamic simulation tools GTOSS (Generalized Tethered Object System Simulation) and TSSIM (Tethered Satellite System) and use of these and other tools in the analysis of various tether dynamics problems. Several updated versions of GTOSS were delivered during the period of performance by the author of the simulation, Lang Associates' David Lang. These updates had mainly to do with updated documentation and an updated coordinate system definition to the J2000 standards. This Final Report is organized by the months in which the activities described were performed. The following sections review the Statement of Work (SOW) and activities performed to satisfy it.
Avionics Tether Operations Control
28.09.2001
Report
Keine Angabe
Englisch
Avionics Tether Operations Control
NTIS | 2001
|Electrodynamic Tether Operations and Control
NTRS | 2001
|STS-75/TSS-1R Tether Control & Dynamics Operations
British Library Conference Proceedings | 1998
|FIM Avionics Operations Manual
NTRS | 2017
|FIM Avionics Operations Manual
NTIS | 2017
|