The activities described in this Final Report were authorized and performed under Purchase Order Number H32835D, issued as part of NASA contract number NAS8-00114. The period of performance of this PO was from March 1 to September 30, 2001. The primary work activity was the continued development and updating of the tether dynamic simulation tools GTOSS (Generalized Tethered Object System Simulation) and TSSIM (Tethered Satellite System) and use of these and other tools in the analysis of various tether dynamics problems. Several updated versions of GTOSS were delivered during the period of performance by the author of the simulation, Lang Associates' David Lang. These updates had mainly to do with updated documentation and an updated coordinate system definition to the J2000 standards. This Final Report is organized by the months in which the activities described were performed. The following sections review the Statement of Work (SOW) and activities performed to satisfy it.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Avionics Tether Operations Control


    Beteiligte:
    J. R. Glaese (Autor:in)

    Erscheinungsdatum :

    2001


    Format / Umfang :

    42 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Avionics Tether Operations Control

    Glaese, John R. | NTRS | 2001



    STS-75/TSS-1R Tether Control & Dynamics Operations

    Williams, J. L. / George C. Marshall Space Flight Center | British Library Conference Proceedings | 1998


    FIM Avionics Operations Manual

    Alves, Erin E. | NTRS | 2017


    FIM Avionics Operations Manual

    E. E. Alves | NTIS | 2017