The Missouri Pacific Railroad has developed and is implementing a computerized system which will enhance freight car scheduling and overall service. This document describes the results of an Advanced Systems Study task, the purpose of which was to examine possible further exploitation of the car scheduling system developed under the contract. Reports of six areas examined identify important ways in which car scheduling could possibly be exploited. Missouri Pacific has not yet committed to develop the capabilities as described.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Missouri Pacific's Computerized Freight Car Scheduling System: Advanced Systems Study


    Erscheinungsdatum :

    1980


    Format / Umfang :

    133 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch