This report describes the design and planned operation of the Missouri Pacific car scheduling system. The design is based on a car scheduling prototype effort. The car scheduling programs actually implemented may vary somewhat from this design as user requirements and system limitations are more fully defined in detailed functional specifications.
Missouri Pacific's Computerized Freight Car Scheduling System Functional Requirements
1977
149 pages
Report
Keine Angabe
Englisch
Transit meets freight: West Valley TRAX over Union Pacific's Roper Yard.
Online Contents | 2012