The 2009-2012 Pavement Management Plan, which was completed last year, provided TxDOT with a mechanism to be able to predict pavement conditions based on a specified funding level and project specific plan. The resulting report consisted of the summary of the number of lane miles that each district planned to treat as Preventive Maintenance (PM), Light, Medium or Heavy Rehabilitation and the impact that those treatments would have on the pavement conditions. This year, the plan has been updated to extend to FY2013 and a similar report generated.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Four(4)-Year Pavement Management Plan: Analysis Report


    Beteiligte:
    Z. Zhang (Autor:in) / M. R. Murphy (Autor:in) / S. Jaipuria (Autor:in) / W. Liu (Autor:in)

    Erscheinungsdatum :

    2009


    Format / Umfang :

    100 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Truck division commited to four-year plan

    Bunting, A. | Tema Archiv | 1976


    Pavement Quality Indicators Study Five Year Report

    C. Kluver / W. Jensen | NTIS | 2008


    SHRP-LTPP Specific Pavement Studies: Five-Year Report

    A. N. Hanna / S. D. Tayabji / J. S. Miller | NTIS | 1994


    Prestressed Pavement Performance in Four States: a Panel Report

    W. L. Gramling / T. P. Teng / G. R. Morris et al. | NTIS | 1983