Planned operational phases linked to the SIGNE 3 satellite, together the structural design and telemetric equipment, are described. The satellite is to be launched by the USSR; thereafter the responsibilities will be assumed by French experts monitoring orbital flight, and starting and controlling experiments. A brief summary of the mission's objective is first given, then the system resources, i.e., satellite and ground resources are succinctly described. (Author)
General Operations Program Signe 3
1976
28 pages
Report
Keine Angabe
Englisch
TECHNOLOGIE - Missile hybride signé Boeing
Online Contents | 2007
Temporal Structures in the SIGNE GRBs
British Library Conference Proceedings | 1995
|INDUSTRIE - Eurocopter résiste et signe
Online Contents | 2004
Danish butane carrier "Signe Tholstrup"
Engineering Index Backfile | 1958