Traffic load changes as a result of expansion of recreation facilities may be predicted through computations based on estimates of: Drawing power of the recreation attractions, overnight accommodations, and in- or out- terminals; probable types of travel; probable routes of travel; and total number of cars in the recreation system. Once the basic model has been established, development alternatives may be simulated to provide percent change estimates of probable traffic load effects on each link of the road system. Illustrative estimates are made for six alternatives for the Harney Peak area of South Dakota.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Predicting Traffic Load Impact of Alternative Recreation Development


    Beteiligte:
    G. H. Elsner (Autor:in) / R. A. Oliveira (Autor:in)

    Erscheinungsdatum :

    1973


    Format / Umfang :

    15 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Performance of alternative tie material under heavy-axle-load traffic

    Jimenez, Rafael / LoPresti, Joe | IuD Bahn | 2004


    TIRE LOAD PREDICTING SYSTEM, TIRE LOAD PREDICTING PROGRAM, AND TIRE LOAD PREDICTING METHOD

    NISHIYAMA KENTA | Europäisches Patentamt | 2024

    Freier Zugriff


    Predicting traffic patterns

    KAGOSHIMA ALEXANDER MASARU / SIO NOELLE LINDSAY / DAS KAUSHIK KUNAL | Europäisches Patentamt | 2016

    Freier Zugriff

    The Role of eycting in the Modern Traffic, Sport, Recreation and Tourism

    Eduard Missoni / Tomislav Mlinarić / Ivo Mlinarić | DOAJ | 2012

    Freier Zugriff