This thesis conducts a cost comparison between contractor and organic support for the CH-53 Aircraft in two major operating cost areas, training and aircraft overhaul. A life cycle cost approach is used and cost differentials are found for the twenty year life expectancy of the CH-53 system. The intent of the study was not to criticize or change the existing system, but rather to provide cost data and planning insight for future aircraft systems. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    A Life Cycle Cost Study of Contractor Versus Organic Support of Aircraft Programs


    Beteiligte:

    Erscheinungsdatum :

    1977


    Format / Umfang :

    53 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch