First stage construction on proposed Loop 201 began in 1968. Updated traffic projections based upon recent industrial plant construction dictate modification of previously approved design features where construction has not yet taken place. The recommended modifications will result in a facility better able to meet anticipated demand, in close consonance with local planning, more likely to relieve congestion on an overloaded street system, lower noise and air-pollution levels, and better able to provide fast, safe and efficient transportation. The modifications would require some additional right of way resulting in the displacement of two houses and one small business, but do not entail any other significant adverse environmental effects.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Partial Modification of Previously Approved Design of Loop 201. A Partially Constructed Controlled-Access Highway from State Highway 146 Near Missouri Street, to State Highway 146 Near McKinney Road, Harris County, Texas


    Erscheinungsdatum :

    1973


    Format / Umfang :

    37 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch