The proposed action consists of construction of a portion of Beltway 8 as a controlled access freeway in Harris County. A slight increase in noise level in a residential subdivision will occur. The air pollution products of vehicles will be transferred from another area to the proposed location. The water of Buffalo Bayou may be subjected to a temporary increase in pollution during construction.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Beltway 8, From State Highway 225 to Interstate Highway 10, in Harris County, Texas


    Erscheinungsdatum :

    1971


    Format / Umfang :

    17 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch