In August of 2002, the Office of System Capacity (ASC) was contacted to assist Phoenix Sky Harbor Air Traffic Control Tower (PHX-ATCT) in an evaluation of delay impacts caused by the reconstruction of Runway 7L/25R scheduled for January of 2003. The Office of System Capacity asked the Modeling and Analysis Group of the FAA Technical Center to apply their fast-time computer modeling techniques to analyze the ground movement implications of the reconstruction. The reconstruction of Runway 7L/25R is to be accomplished in several phases: Phase 1 was the preparation work for the reconstruction with the work being accomplished without major runway impacts; Phase 2 requires the complete closure of runway 7L/25R with only limited taxiways available for crossing the construction zone: Phase 3 occurs when a portion of Runway 7L/25R becomes available for aircraft use. This report addresses only Phase 2 - the complete closure of Runway 7L/25R.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Phoenix Sky Harbor International Airport, Airport Capacity Tactical Initiative, Ground Movement Analysis during Reconstruction of Runway 7L/25R


    Beteiligte:
    R. J. Holladay (Autor:in) / G. Renauro (Autor:in)

    Erscheinungsdatum :

    2003


    Format / Umfang :

    42 pages


    Medientyp :

    Report