The vessel design described in the report is an attempt to fulfill the specification requirements with an economical vessel from the standpoint both of first costs and operating costs. It is believed that this ship will form a satisfactory base of operation for Project Mohole, fulfilling all requirements of the drilling vessel but without unnecessary refinements. For example, the hull form is a simplified barge-like hull which could not be propelled economically at a higher speed. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Project Mohole-Phase II. Report on New Drilling Ship


    Erscheinungsdatum :

    1962


    Format / Umfang :

    55 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch