The project involves construction of a high level fixed span, multi-lane bridge and approaches across the Intracoastal Waterway in Palm Beach County, Florida. The improvement will require using a portion of Phil Foster Park recreation and swimming area. Major impacts are reduction of aquatic bottom areas, enhancement of water quality, reduction in noise and air pollution for the Phil Foster Park recreation area, and elimination of interrupted traffic flow conditions for both surface vehicles and watercraft.
State Job No. 93080-1506, Federal Project No. SU-684(1), State Road A-1-A (Blue Heron Boulevard) Intracoastal Waterway Bridge and Approaches, East of US 1 to Singer Island, Riviera Beach, Palm Beach, Count y, Florida
1972
117 pages
Report
Keine Angabe
Englisch
Hybrid Bridge Strengthening Structural Rehabilitation of Blue Heron Bridge, West Palm Beach, Florida
Transportation Research Record | 2004
|Atlantic intracoastal waterway
Engineering Index Backfile | 1931
|