This test plan sets forth the requirements necessary to qualify the test facility and equipment installation at the INEL in order to continue DOE programmatic testing of electric vehicles. Briefly, dynamometer tests will be performed on the Electric Test Vehicle 1-2 (ETV1-2) at constant speeds of 35, 45, and 55 mph and for the schedule D driving cycle. (ERA citation 10:010053)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Electric Vehicle Test Program: INEL Transition Qualification Test Plan


    Beteiligte:
    H. W. Heiselmann (Autor:in) / H. E. Knauts (Autor:in)

    Erscheinungsdatum :

    1984


    Format / Umfang :

    49 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Space Nuclear Thermal Propulsion Test Facilities Accommodation at INEL

    Hill, T. J. / Reed, W. C. / Welland, H. J. et al. | British Library Conference Proceedings | 1993


    INEL - hybrid / electric - an integrated approach

    Kramer,W.E. / Idaho National Engineering Lab.,US | Kraftfahrwesen | 1995


    INEL Advanced Test Reactor Plutonium-238 Production Feasibility Assessment

    Schnitzler, B. G. / American Institute of Physics | British Library Conference Proceedings | 1993