On Friday, May 14, 2004, at approximately 11:30 a.m., a dump truck transporting mixing tank T-12 (Tank T-12) from the New Hydrofracture Facility (NHF) Decontamination and Decommissioning (D&D) Project arrived at the Environmental Management Waste Management Facility (EMWMF). Upon arrival, an incoming radiological survey was performed. While the results of the radiological survey were being processed, the dump truck proceeded to the weigh station and the disposal cell. Radiological Control (RADCON) personnel confirmed the presence of contamination on the dump truck and stopped the dump truck prior to its entrance into the cell area. Surveys were initiated to determine the extent of the contamination.
Type B Accident Investigation Board Report. Subcontractor Radioactive Release During the May 14, 2004, Transportation Activities Bechtel Jacobs Company LLC Oak Ridge, Tennessee
2004
98 pages
Report
Keine Angabe
Englisch
Radiation Pollution & Control , Public Health & Industrial Medicine , Radioactive Wastes & Radioactivity , Radiation Shielding, Protection, & Safety , Radiation pollution , Accident investigation , Incidents , Remediation , Dump trucks , Contamination , Transportation , Barrier analysis , Change analysis , Lessons learned , Safety management , Causal factor analysis , Notifications , Responses , Hazardous materials , Oak Ridge(Tennessee) , Mixing tanks , Bechtel Jacobs Company
Lancashire subcontractor expands
Emerald Group Publishing | 2009
Subcontractor increases flexibility
Emerald Group Publishing | 2008