The main objectives of this study were to develop procedures for estimating the level of service on freeway frontage roads and to determine desirable spacings for ramp junctions. The tasks involved developing (1) procedures for analyzing frontage road weaving sections, (2) recommended spacing requirements for ramp junctions, and (3) a technique to evaluate overall operations on a continuous frontage road section. The two weaving segments analyzed included a one-sided weaving area formed by an exit ramp followed by an entrance ramp and connected by an auxiliary lane and a two-sided weaving area formed by an exit ramp followed by a downstream signalized intersection.