The overall objective of the 1160 test series is to demonstrate satisfactory Mode 6 (storage discharging) operation in all possible control/operating configurations associated with this mode. The tests are also to verify published operating procedures or to modify the procedures as required. Another objective is to gather limited plant performance data. The acceptance criteria for these tests, limits and precautions, equipment, and all the procedures are listed. (ERA citation 10:015970)
10 MWe Solar Thermal Central Receiver Pilot Plant Mode 6: Storage Discharging Performance Test Procedure 1160
1984
133 pages
Report
Keine Angabe
Englisch