Extensive modifications to the Navy Experimental Diving Unit Hyperbaric Facility were performed by the Portsmouth New Hampshire Naval Shipyard during 1971. This report describes and documents the modifications which consist of installing penetrators, modifying hatch seals, magnetic particle testing welds and repair welding performed on the pressure hull. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Portsmouth Naval Shipyard Chamber Modifications. 1971


    Beteiligte:
    R. Y. Iha (Autor:in)

    Erscheinungsdatum :

    1972


    Format / Umfang :

    17 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Keeping Old Running as New at Portsmouth Naval Shipyard

    Harris, Lukian / Riden, Kirk / Somma, Danielle et al. | ASCE | 2022


    Radiological Survey of Portsmouth Naval Shipyard, Kittery, Maine, and Environs

    R. S. Callis / S. T. Windham / C. R. Phillips | NTIS | 1979



    The ideal naval shipyard

    Gluse, M.R. | Tema Archiv | 1989


    Naval Shipyard Machine Shop Modernization

    K. C. Doehnert / B. Winton | NTIS | 1993