This paper discusses the engineering challenges and constraints encountered during the modernization of a submarine berth that was originally constructed over 100 years ago, to increase the number of contemporary vessels that could be berthed at the same time. Additionally, this paper describes the history of the facility, the engineering studies, and innovative solutions developed to extend its service life, as well as the proactive measures taken by Naval Facilities Engineering Systems Command (NAVFAC) to maintain efficient shipyard operations aligned with the goals of the Shipyard Infrastructure Optimization Program (SIOP).
Keeping Old Running as New at Portsmouth Naval Shipyard
16th Triennial International Conference ; 2022 ; Honolulu, Hawaii
Ports 2022 ; 788-798
2022-09-15
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Naval shipyard cost accounting
Engineering Index Backfile | 1950
|Tema Archiv | 1989
|Naval Shipyard Gdynia: Export landing craft
Online Contents | 2001
Naval shipyard computer-aided time standards
Tema Archiv | 1986
|THE PORTSMOUTH NAVAL ACADEMY, 1733–1806
Taylor & Francis Verlag | 2003
|