An Advanced Traffic Management System (ATMS), referred to as TRIMARC (Traffic Response and Incident Management Assisting the River Cities), was installed in the Louisville, Kentucky and souther Indiana area. A system integrator approach was used for the installation, operation, and maintenance of this system. Special Experiment Project No. 14 (SEP-14) procedures were used to procure the service of the equipment installation contractor. An evaluation was conducted to determine the effectiveness of the process approved for this procurement.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Evaluation of TRIMARC Procurement Procedures (Interim Report)


    Beteiligte:
    M. L. Osborne (Autor:in) / J. G. Pigman (Autor:in)

    Erscheinungsdatum :

    1999


    Format / Umfang :

    32 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Evaluation of TRIMARC Procurement Procedures

    M. L. Barrett / J. G. Pigman | NTIS | 2001



    Planning, Procurement and Contract Procedures

    Koshi, N. | British Library Conference Proceedings | 1993


    Interim brake report

    Engineering Index Backfile | 1951


    Concorde -- Interim report

    Engineering Index Backfile | 1965