A re-evaluation of the development program hardware costs, based on more complete design information and the incorporation of additional cost saving manufacturing techniques expected to be realized over the course of the program, results in a reduction in the JTF17A-20 supersonic transport engine development and production cost baseline estimates. These reductions by phases are shown in Sections II, III, and IV of this report. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren





    Multi-baseline polarimetrically optimised phases and scattering mechanisms for InSAR applications

    Reigber, Andreas / Neumann, Maxim / Esra, Erten et al. | Deutsches Zentrum für Luft- und Raumfahrt (DLR) | 2007

    Freier Zugriff

    B-1B Human Factors Baseline Study Report

    W. G. Kalman / J. M. Kline / S. Provost et al. | NTIS | 1999


    TRANSMIT Evaluation: Transit Application Baseline Data Report

    C. A. Zimmerman / S. Sheffield / S. Armington et al. | NTIS | 2002