From October 1983 to November 1984, a lubrication study funded by the Federal Railroad Administration was conducted by the Association of American Railroads at the Facility for Accelerated Service Testing (FAST) at the Transportation Test Center in Pueblo, Colorado. The study focused on lubricant distribution (the level, uniformity, and location of grease on the rail) and effectiveness (ability of the lubricant to reduce rail wear and decrease train resistance). A 'goop gauge' served to monitor distribution. Lubrication effectiveness was determined by measuring wheel-rail longitudinal force (instrumented wheelset) and rail head temperature rise (thermal sensors). The wayside systems had actuator linkage and adjustment problems. Some lubricator blade types and track locations performed better than others but all had position-in-curve differentials of effectiveness. The spray type locomotive flange lubricator performed best overall, but showed a possible need for supplementary lubrication in some curves. The boxcar lubricator did similarly well, but had further practical limitations. The hi-rail system was generally not satisfactory because the lubricant, sprayed directly on the rails, could not be distributed properly under all track conditions. 'Off-the-shelf' greases performed most effectively, particularly an open gear type. Overlubrication tests linked excess high rail lateral forces with the typical operation of some wayside lubricators.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Overview: The FAST (Facility for Accelerated Service Testing) Lubrication Study


    Beteiligte:
    R. P. Reiff (Autor:in)

    Erscheinungsdatum :

    1986


    Format / Umfang :

    23 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Functional Requirements for a Facility for Accelerated Service Testing (FAST)

    S. K. Punwani / J. R. Lundgren / G. C. Martin | NTIS | 1975


    Planning the facility for accelerated service testing

    Martin, G. / Punwani, S. / Lundgren, J. | Tema Archiv | 1977



    Testing new weld products at the facility for accelerated service testing

    Gutscher, Daniel / LoPresti, Joseph | IuD Bahn | 2013