To reduce negative effects of congestion delays and adverse community impacts, several people moving strategies were implemented. Appendix I describes the affected highway/street network, construction-induced traffic restrictions and traffic operation improvements; and results of an extensive data collection program performed before, during and after the first year construction phase, to determine corridor traffic volumes, vehicle occupancy/classification, and travel times on the Parkway and other alternate routes.
Study of Alternative Transportation Strategies during Reconstruction of the Parkway East, I-376, Pittsburgh, Pennsylvania. Appendix 1. Traffic Characteristics
1983
219 pages
Report
Keine Angabe
Englisch
Transportation & Traffic Planning , Road Transportation , Transportation , Interstate highway system , Transportation management , Traffic engineering , Construction , Urban areas , Travel time , Pennsylvania , Interstate highway 376 , Pittsburgh(Pennsylvania) , High occupancy vehicles , Van pools , Park and ride , Commuter rail systems