Before conducting the missile composite checkout, successful performance of each individual system installed on the missile must be determined. The following is a list of the procedures used for acceptance testing of each system: Abort sensing and implementation system; Azusa system; Electrical system; Flight control system; Guidance system; Propellant utilization system; Propulsion system; Range safety command system; and Telemetry system. (Author)