The results of a cost and program estimate for a Spacelab-borne lidar facility are presented. Various model philosophies were examined and a single flight model with identified spares backing was selected to meet program constraints and provide an optimum cost/risk ratio. A program is given which will meet the required launch date, identifying predicted problem areas. A budgetary cost estimate for the identified project is given, detailed down to unit level. Several areas where lack of requirements gives rise to cost uncertainty are described.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Lidar Development Cost Study Report. Volume 1: Technical


    Beteiligte:
    G. W. Cocks (Autor:in) / A. F. Cole (Autor:in) / K. Hecks (Autor:in)

    Erscheinungsdatum :

    1976


    Format / Umfang :

    64 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch