The Oslofjord Link was opened June 29, 2000. From Drammen time saving is 20 minutes and the tunnel route is 25 km shorter than the route via Oslo. Daily traffic in 2001 was 3930 vehicles while the forecast was 4200 vehicles. There seem to be a clear increase in traffic volume from second half of 2001. The actual share of trucks was 6% while the estimated share was 16% while the estimated share was 16%. The main alternative route is via Oslo.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Oslojordforgindelsen: Trafikk og Regionale Virkninger


    Beteiligte:
    J. I. Lian (Autor:in) / B. Grue (Autor:in) / S. Strand (Autor:in)

    Erscheinungsdatum :

    2002


    Format / Umfang :

    84 pages



    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch