The following optimization problem is considered; airplanes fly on prescribed routes and are flown by crews who must be rested after the passage of a certain interval of flying time. Rested crews who are stationed at bases on the routes can be deployed to keep the planes in flight. For a prescribed number of planes and crews, it is desired to place the crews at bases such that the amount of time spent by the planes in the air is a maximum. This paper investigates the use of a queueing network model as a means of formulating the optimization problem. Upper and lower bounds are presented for the expected fraction of time planes are airborne. These bounds may be useful in solving the optimization problem by means of a simulation model. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    A Queueing Network Approach to a Crew Scheduling Problem


    Beteiligte:
    A. L. Sweet (Autor:in)

    Erscheinungsdatum :

    1980


    Format / Umfang :

    22 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Crew Scheduling Problem

    Vaidyanathan, Balachandran / Ahuja, Ravindra K. | Springer Verlag | 2015


    The crew timetabling problem: An extension of the crew scheduling problem

    Gomes, Marta Castilho / Cavique, Luís / Themido, Isabel | Springer Verlag | 2006


    The crew timetabling problem: An extension of the crew scheduling problem

    Gomes, M. C. / Cavique, L. s. / Themido, I. | British Library Conference Proceedings | 2006


    The Operational Airline Crew Scheduling Problem

    Stojkovic, M. / Soumis, F. / Desrosiers, J. | British Library Online Contents | 1998


    The Operational Airline Crew Scheduling Problem

    Stojkovic, Mirela | Online Contents | 1998