The crew scheduling problem (CSP) involves assigning crew to trains, while satisfying a variety of Federal Railway Administration (FRA) regulations and trade-union work rules. Train crew work together to move a train from its origin to its destination. As the train travels over its route, it goes through numerous crew districts. In each crew district, the train is manned by an engineer and a conductor who are qualified to operate the train within that district. The objectives of crew scheduling are therefore to assign crew to the trains, while minimizing the cost of operating trains, improving crew quality of life, and satisfying all FRA regulations and work rules.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Crew Scheduling Problem


    Weitere Titelangaben:

    Int.Ser.Operations Res.


    Beteiligte:


    Erscheinungsdatum :

    2015-01-01


    Format / Umfang :

    13 pages





    Medientyp :

    Aufsatz/Kapitel (Buch)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    The crew timetabling problem: An extension of the crew scheduling problem

    Gomes, M. C. / Cavique, L. s. / Themido, I. | British Library Conference Proceedings | 2006


    The Operational Airline Crew Scheduling Problem

    Stojkovic, Mirela | Online Contents | 1998


    The Operational Airline Crew Scheduling Problem

    Stojkovic, M. / Soumis, F. / Desrosiers, J. | British Library Online Contents | 1998


    CREW SCHEDULING SYSTEM AND CREW SCHEDULING METHOD

    KUBO HIDEKI | Europäisches Patentamt | 2017

    Freier Zugriff