Many different actors have to collaborate in order to guarantee efficient railway traffic that is safe, on time, comfortable, eco-friendly and economic. Appropriate planning is necessary: The transport company has to provide rolling stock and personnel, the traffic controllers have to solve perturbations proficiently, and the train drivers have to drive in a way, as far as the traffic plan allows, that saves energy and reduces wearing on rolling stock and infrastructure. In order to find a globally optimal solution, all actors need optimal access to information on the current traffic situation.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Improved railway service by shared traffic information


    Beteiligte:


    Erscheinungsdatum :

    01.08.2013


    Format / Umfang :

    867373 byte




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Railway shared flatcar

    HUANG YANLAN / LYU CHAO / ZHANG LIWU et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Railway shared flatcar

    DU LIFENG / WANG BAOTONG / CHEN GUOLIANG | Europäisches Patentamt | 2020

    Freier Zugriff


    Railway traffic

    Engineering Index Backfile | 1929


    Railway traffic

    Engineering Index Backfile | 1903