Nowadays the amount of electrical power generated on-board ships is drastically increased, especially for the All Electric Ships (AES) where all the energy needed is supplied by the electrical power system. In this context, the traditional methods to calculate the power demand and select the size of the generation system have become inadequate, since they are based on very dated assumptions. Aim of this paper is to present an optimum problem in order to correctly and efficiently size the generation system. The power demanded will be calculated using the traditional approach based on Load Factors. The optimum problem will be solved using the Genetic Algorithms, and provide the optimal size, load factors and unit commitment for each generator in each ship operative scenario.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Ship electrical load analysis and power generation optimisation to reduce operational costs


    Beteiligte:


    Erscheinungsdatum :

    01.11.2016


    Format / Umfang :

    284377 byte




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Optimizing Cargo Ship Operational Costs: A Comprehensive Algorithmic Approach

    Sree, Kuruva Divya / Gunti, Geethika / Neelima, Nizampatnam et al. | IEEE | 2024


    Peak-load power generation facility using scrapped ship

    Europäisches Patentamt | 2023

    Freier Zugriff

    Peak-load power generation facility using scrapped ship

    CHOI SOO YOUNG / SHIN DONG WON / AHN YOON HWAN | Europäisches Patentamt | 2022

    Freier Zugriff

    Re-Engineering of the Hubble Space Telescope to Reduce Operational Costs

    Garvis, M. | British Library Online Contents | 1996