To divide the interlocking logic (station control process) into functional units and station units and to make it possible to stop the function of the program abnormally at the function unit or station unit.SOLUTION: An interlocking control system has a first control device provided at a first point, and a second control device and a third control device which are corresponding to each station. The second control device and the third control device corresponding to each station include a communication interface which connects the first control device and station on-site equipment. The first control device includes a station control process which operates on a middleware and is corresponding to each station, and enables process communication between station control processes, and each station on-site equipment can be controlled from the first control device via the communication interface.SELECTED DRAWING: Figure 1
【課題】連動論理(駅制御プロセス)を機能単位、駅単位に分割して、プログラム異常に機能単位、駅単位での機能停止を可能とする。【解決手段】第1の地点に設けられた第1制御装置と、各駅対応の第2制御装置および第3制御装置と、を有し、各駅対応の第2制御装置および第3制御装置は、第1制御装置と駅現場機器とを接続する通信インターフェースを含み、第1制御装置は、ミドルウェア上で動作する各駅対応の駅制御プロセスを含み、駅制御プロセス間でプロセス通信を可能とし、第1制御装置から通信インターフェースを介して各駅現場機器を制御可能とした連動制御システム。【選択図】図1
INTERLOCKING CONTROL SYSTEM
連動制御システム
2021-02-22
Patent
Elektronische Ressource
Japanisch
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
Interlocking control system linked with digital key and interlocking control method thereof
Europäisches Patentamt | 2022
|