An energy management method includes determining whether a current time is within a target period (S1 1), and executing energy management within the target period by a target resource selected from among a plurality of power storage devices (S12 to S15). The executing the energy management includes charging the target resource to execute the energy management within the target period, and reselecting the target resource from among the power storage devices for suppression of a state in which each of the power storage devices reaches a target charging amount within the target period.
ENERGY MANAGEMENT METHOD, STORAGE MEDIUM STORING PROGRAM, AND COMPUTER DEVICE
ENERGIEVERWALTUNGSVERFAHREN, SPEICHERMEDIUM MIT DARAUF GESPEICHERTEM PROGRAMM UND COMPUTERVORRICHTUNG
PROCÉDÉ DE GESTION D'ÉNERGIE, SUPPORT DE STOCKAGE STOCKANT UN PROGRAMME ET DISPOSITIF INFORMATIQUE
2024-02-14
Patent
Elektronische Ressource
Englisch
IPC: | B60L PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES , Antrieb von elektrisch angetriebenen Fahrzeugen |
Energy management method, storage medium storing program, and computer device
Europäisches Patentamt | 2024
|ENERGY MANAGEMENT METHOD, STORAGE MEDIUM STORING PROGRAM, AND COMPUTER DEVICE
Europäisches Patentamt | 2024
|Control device, control method, and computer-readable storage medium storing program
Europäisches Patentamt | 2021
|Management device, vehicle, management system, method, and storage medium storing a program
Europäisches Patentamt | 2024
|VEHICULER DEVICE AND COMPUTER-READABLE NON-TRANSITORY STORAGE MEDIUM STORING COMPUTER PROGRAM
Europäisches Patentamt | 2020
|