A method for installing a guide rail of an elevator installation arranged in an elevator shaft, wherein the guide rail includes a multiplicity of guide-rail segments that are aligned and arranged in a row one beside the other, includes the following steps: fixing an aligning element in the elevator shaft at a first point in relation to an aligned and fastened first one of the guide-rail segments, wherein the first point is positioned on a route provided by horizontally directed parallel displacement of the route formed by the first guide-rail segment; fixing the aligning element at a second point, in the form of a reference point, in the elevator shaft, an aligning-element portion for aligning a second one of the guide-rail segments therefore being formed between the first and the second points; and aligning the second guide-rail segment relative to the aligning-element portion.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    VERFAHREN ZUR INSTALLATION VON FÜHRUNGSSCHIENEN


    Weitere Titelangaben:

    METHOD FOR INSTALLING GUIDE RAILS
    PROCÉDÉ D'INSTALLATION DE RAILS DE GUIDAGE


    Beteiligte:
    PÜNTENER URS (Autor:in) / BUNTSCHU STEFAN (Autor:in)

    Erscheinungsdatum :

    2020-09-30


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Deutsch


    Klassifikation :

    IPC:    B66B Aufzüge , ELEVATORS



    VERFAHREN ZUR INSTALLATION VON FÜHRUNGSSCHIENEN

    PÜNTENER URS / BUNTSCHU STEFAN | Europäisches Patentamt | 2016

    Freier Zugriff

    ANORDNUNG VON FÜHRUNGSSCHIENEN

    MADERA MARTIN / KRIEG MARTIN | Europäisches Patentamt | 2018

    Freier Zugriff

    Führungsschienen-Befestigungsvorrichtung

    FUNAI NOBUHITO | Europäisches Patentamt | 2018

    Freier Zugriff

    Führungsschienen-Fixiereinrichtung für Aufzug

    KYUE KAZUHIRO | Europäisches Patentamt | 2020

    Freier Zugriff

    Anordnung von Führungsschienen

    MADERA MARTIN / KRIEG MARTIN | Europäisches Patentamt | 2018

    Freier Zugriff