The invention discloses a wind power concrete tower drum hoisting device, a hoisting construction platform and a hoisting method thereof, and belongs to the technical field of wind power tower drum hoisting. The wind power concrete tower drum hoisting device comprises a hoisting unit, the hoisting unit comprises a vehicle body and a hoisting module, and the vehicle body is used for conveying the hoisting module; a connecting unit is arranged at the end part of the steel wire rope on the hoisting module and is used for connecting the concrete tower drum and the hoisting table component. The hoisting platform component can be installed on the top of the concrete tower drum through the fixing part, convenience and rapidness are achieved, stability is good, then the position of the concrete tower drum in hoisting can be guided through the guiding unit, and therefore rapid butt joint work of two concrete tower drums can be achieved; and the labor intensity of workers is effectively reduced.
本发明公开了风电混凝土塔筒吊装装置、吊装施工平台及其吊装方法,属于风电塔筒吊装技术领域,该风电混凝土塔筒吊装装置,包括吊装单元,所述吊装单元包括车体以及吊装模块,所述车体用于对吊装模块进行输送,所述吊装模块上的钢丝绳端部设置有连接单元,所述连接单元用于连接混凝土塔筒和吊装台构件。本发明能够通过固定部能够将吊装台构件安装于混凝土塔筒的顶部,方便快捷,稳定性较好,然后通过引导单元能够对吊装中的混凝土塔筒的位置进行引导,从而能够实现两个混凝土塔筒的快速对接工作,有效的降低了工作人员的劳动强度。
Wind power concrete tower drum hoisting device, hoisting construction platform and hoisting method thereof
风电混凝土塔筒吊装装置、吊装施工平台及其吊装方法
25.03.2025
Patent
Elektronische Ressource
Chinesisch
IPC: | B66C Krane , CRANES |