A multi-cylinder combined driving method for jacking and putting down a pile frame of a pile driving barge comprises the steps that A, large pile driving barge pile frame jacking operation is conducted, P1, in the first stage, the angle of the pile frame is rotated to-49.91 degrees from-69.5 degrees, P2, in the second stage, the angle of the pile frame is rotated to-39.53 degrees from-49.91 degrees, P3, in the third stage, the angle of the pile frame is rotated to-27.62 degrees from-39.53 degrees, P4, in the fourth stage, the angle of the pile frame is rotated to 0 degree from-27.62 degrees, and P5, in the fifth stage, the angle of the pile frame is rotated to 0 degree from-27.62 degrees; according to the method, the pressure and the speed of a hydraulic system can be automatically adjusted according to the weight of the large pile frame, the oil pressure and the state of each hydraulic cylinder are automatically controlled according to parameters monitored in the whole process of a sensor, it is guaranteed that loads among a multi-cylinder system are reasonably distributed, and the safety risk under driving of a single hydraulic cylinder is reduced. And under the piling working condition, one main oil cylinder is used for completing amplitude variation operation.

    一种打桩船桩架顶升和放倒的多缸联合驱动方法,其步骤为:A.大型打桩船桩架顶升作业:P1.第1阶段:桩架角度从‑69.5°转至‑49.91°,P2.第2阶段:桩架角度从‑49.91°转至‑39.53°,P3.第3阶段:桩架角度从‑39.53°转至‑27.62°,P4.第4阶段:桩架角度从‑27.62°转至0°,B.大型打桩船桩架放倒作业,本发明能够根据大型桩架的重量自动调整液压系统的压力和速度,根据传感器全过程监测参数自动控制每个液压缸的油压与状态,保证多缸系统间的负载分配合理,降低了单液压缸驱动下的安全风险。打桩作业工况时由1根主油缸完成变幅作业。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Multi-cylinder combined driving method for jacking and putting down pile frame of pile driving barge


    Weitere Titelangaben:

    一种打桩船桩架顶升和放倒的多缸联合驱动方法


    Beteiligte:
    XU YANDONG (Autor:in) / LI LI (Autor:in) / GAO XIAODONG (Autor:in) / ZHANG JING (Autor:in) / LIU JUNLIANG (Autor:in) / LIU MING (Autor:in) / SOMMOU (Autor:in) / YANG HELIN (Autor:in) / SU YIRU (Autor:in) / SHI JULIN (Autor:in)

    Erscheinungsdatum :

    18.10.2022


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    E02D FOUNDATIONS , Gründungen / B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS / F15B SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL , Druckmittelbetriebene Systeme allgemein



    Pile frame jacking device of pile driving barge, and pile frame jacking and lying method

    YU GUOBIN / YU HUI / ZHANG TIE et al. | Europäisches Patentamt | 2020

    Freier Zugriff


    Pile driving barge pile frame system and control method

    ZHANG QINGSHENG / WANG TAO / HANG AIQUN et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Pile driving barge pile frame pile reversing mechanism and working method thereof

    DAI XUELIANG / GAO ZHUOPENG / ZOU XUEYI et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Intertidal zone pile driving barge and moving method of pile driving barge

    QIN WEI / GAO JIAYU / CAI SHENGYU et al. | Europäisches Patentamt | 2023

    Freier Zugriff