The invention relates to a high-pier pier top 0 # block bracket prepressing device and a construction method. The pre-pressing device comprises two pre-pressing units symmetrically installed on the two sides of the high pier. The pre-pressing unit comprises a winch, a concrete bracket, a reaction frame, a steering pulley A, a steering pulley B, a steering pulley C and a water storage tank. A distributive girder A is mounted on the concrete bracket; a distributive girder B is mounted on the reaction frame; a plurality of fixed pulleys A and fixed pulleys B are respectively arranged on the distributive girder A and the distributive girder B at intervals along the length direction; the deflecting pulley A is installed on the top of the high pier, and the deflecting pulley B is installed on the side part of the top of the high pier and located above the concrete bracket. The steering pulley C is mounted at the side part of the high pier and is positioned between the concrete bracket and the reaction frame; the device can easily control the prepressing load balance of the two sides of the pier stud, the loading position is accurately controlled by adjusting the positions of the fixed pulleys, and the distribution of actual loads on a concrete bracket can be better simulated.

    本发明涉及一种高墩墩顶0#块托架预压的装置及施工方法,包括对称安装在高墩两侧的两个预压单元,所述预压单元包括卷扬机、混凝土托架、反力架、转向滑轮A、转向滑轮B、转向滑轮C、储水箱,混凝土托架上安装有分配梁A,反力架上安装有分配梁B,分配梁A、分配梁B上沿长度方向分别间隔安装若干定滑轮A、定滑轮B,转向滑轮A安装在高墩墩顶上、转向滑轮B安装在高墩墩顶的侧部并位于混凝土托架上方,转向滑轮C安装在高墩侧部并位于混凝土托架与反力架之间,储水箱悬挂在扬机的钢丝绳末端,本装置能够轻松地控制墩柱两侧的预压载荷平衡性,通过调整定滑轮的位置准确控制加载位置,可以更好地模拟混凝土托架上实际荷载的分布。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    High-pier pier top 0 # block bracket prepressing device and construction method


    Weitere Titelangaben:

    高墩墩顶0#块托架预压的装置及施工方法


    Beteiligte:
    HUANG XINYI (Autor:in) / CHEN GANGLU (Autor:in) / GU YIN (Autor:in) / SUN YING (Autor:in) / ZHUO WEIDONG (Autor:in)

    Erscheinungsdatum :

    2020-09-11


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    E01D BRIDGES , Brücken / B66D Haspeln , CAPSTANS



    PIER MODULE AND PIER

    SIISKONEN ANTTI / EKQVIST JUSSI | Europäisches Patentamt | 2022

    Freier Zugriff

    Limited space pier group hollow high pier asynchronous hydraulic creeping formwork construction method

    LIN LIQIAN / ZHA ZHILIN / LIN ENHUI et al. | Europäisches Patentamt | 2021

    Freier Zugriff

    Gate pier bracket prefabricated formwork lifting appliance and lifting method

    ZHOU CHUNLIN / PENG MAOJUN / XIANG HAO et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    BICYCLE PIER

    NEUJMIN EVGENIJ PETROVICH | Europäisches Patentamt | 2021

    Freier Zugriff

    FLOATING PIER

    LYCHEV VALERIJ VIKTOROVICH / MARKOVA ALLA ALEKSANDROVNA / SHCHUKIN PAVEL IVANOVICH | Europäisches Patentamt | 2021

    Freier Zugriff