Pittsburgh and Lake Erie made certain track changes and installed new signaling facilities at two junctions as part of arrangement made so that Baltimore and Ohio could operate its through passenger and freight trains over P. and L.E. tracks through Pittsburgh; joint trackage extends 59 mi.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Centralized traffic control installed on Pittsburgh and Lake Erie


    Weitere Titelangaben:

    Ry Signaling


    Erschienen in:

    Erscheinungsdatum :

    1935


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch





    Centralized traffic control on Erie

    Engineering Index Backfile | 1942


    Pittsburgh and Lake Erie new instruction car

    Engineering Index Backfile | 1928


    Pittsburg and Lake Erie station at Pittsburgh

    Engineering Index Backfile | 1901