New York City Transit Authority plans to put automated subway train in service in 1961 on its Times Square-Grand Central shuttle line; for use of train one of shuttle line tracks has been replaced with track of special design; rails are placed on rubber tie pads and are bolted directly to permanent concrete roadbed; joints are " frozen" by "glued joint" process.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Subway track has concrete roadbed, rubber tire plates, 'Glued' joints


    Weitere Titelangaben:

    Ry Track Structures


    Erschienen in:

    Erscheinungsdatum :

    1961


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Strength of glued joints

    de Bruyne, N.A. | Engineering Index Backfile | 1944


    Strength of glued joints

    de Bruyne, N.A. | Engineering Index Backfile | 1944


    Heavily Loaded, Glued Joints

    Eppler, R. | British Library Online Contents | 1998


    The Strength of Glued Joints

    de Bruyne, N.A. | Emerald Group Publishing | 1944