Electrification is chosen for those sections of railway which bear heaviest traffic, whether in terms of high ratio of ton miles per track mile or intense and frequent commuter traffic; with first 5 yr of Plan, 848 track miles have been electrified, and 470 multiple-unit trains and 76 locomotives have been built suitable for operation on third-rail system or on 25 kv a-c system at industrial frequency.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Electric traction in British Railways modernization plan


    Weitere Titelangaben:

    Instn Civ Engrs -- Proc


    Beteiligte:
    Warder, S.B. (Autor:in)


    Erscheinungsdatum :

    1961


    Format / Umfang :

    20 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Engineering aspects of modernization plan for British railways

    Bond, R.C. | Engineering Index Backfile | 1961


    Contribution of civil engineering to British railways modernization plan

    Smith, M.G.R. | Engineering Index Backfile | 1961


    Impact of mechanical engineering on British railways modernization plan

    Harrison, J.F. | Engineering Index Backfile | 1961


    Modernization of traction of French National Railways

    Tessier, M. | Engineering Index Backfile | 1963


    Electric traction on British Railways during 1982

    Wojtas, B.J. / Sandham, B. | Tema Archiv | 1983