Port of London Authority's £1,590,000 scheme to handle bigger vessels described; new No. 1 berth is located on north side of main dock which has been widened from 600 to 900 ft to give increased ship maneuvering area; quay is 842 ft long with return quay of 240 ft at west end; quay supported on 30 monoliths each 30 ft sq varying in depth from 50 to 72 ft. (see also Dock and Harbour Authority v 38 n 442 Aug 1957 p 132-5)
New berth and reception facilities at Tilbury docks
Surveyor
Surveyor ; 116 , n 3402
1957
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New berth and reception facilities at Tilbury docks
Engineering Index Backfile | 1957
Engineering Index Backfile | 1929
Engineering Index Backfile | 1929
Engineering Index Backfile | 1926
Deepwater cargo jetty: tilbury docks
Engineering Index Backfile | 1921