Port of London Authority's £1,590,000 scheme to handle bigger vessels described; new No. 1 berth is located on north side of main dock which has been widened from 600 to 900 ft to give increased ship maneuvering area; quay is 842 ft long with return quay of 240 ft at west end; quay supported on 30 monoliths each 30 ft sq varying in depth from 50 to 72 ft. (See also Surveyor v 116 n 3402 July 6 1957 p 721-2)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    New berth and reception facilities at Tilbury docks


    Weitere Titelangaben:

    Dock Harbour Authority


    Erschienen in:

    Erscheinungsdatum :

    1957


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :



    Tilbury docks improvements

    Engineering Index Backfile | 1929


    Tilbury docks improvements

    Engineering Index Backfile | 1929


    Tilbury docks improvements

    Engineering Index Backfile | 1926


    Deepwater cargo jetty: tilbury docks

    Engineering Index Backfile | 1921